# LIB2-258 — Retired finite-sign chamber-lift price computed on the wrong carrier

- class: RETIRED · review_state: PUBLISHED · house_tier: not yet assigned
- labels as printed: math_status None · attachment None · scorecard tier word none (PDF p.None)
- basis: {"pdf_sha256_prefix": "b64ddcd9e16a6dcd", "release": "Rev33.1_S369"}

## Statement

The earlier chamber-lift row inferred a finite orthogonal-sign ambiguity from a commutant calculated on the wrong permutation carrier.

## Caution

The corrected complement-frame gauge does not add continuous observable freedom or select the microscopic observation functor.

## Primary source

Appendix T, §9 preamble, S253 erratum: wrong-carrier calculation, PDF p.325: "The commutant-3 count was computed on the wrong carrier — the 5-point permutation module"

## Machine

- url: /library-v2/LIB2-258/
- content_sha256: 6c3ba7b021ae4f0c3609b48bc9bc30c6bbc30abaa9b3cf68591ca37c7ab30110
- candidate_ids: C2-093

## Freshness

- BUILD_STAMP S371a · 2026-09-26T22:53Z · master 01d1a5873ede42f5 · cut 9dcc6ce9a8ee3e02
- Declared volatile fields (R36): BUILD_STAMP
